Kill Hill Windfarm (Commissioning): A 50MVA windfarm collecting at 33kV and connected to the EirGrid National Grid at 110kV. 33kV switchgear used was Siemens NXplus C, protection relays used were Siemens and ABB. Conlon Power Services responsible for commissioning of entire Independent Power Producer's side of substation.
Mount Lucas Windfarm (Commissioning): A 90MVA windfarm collecting at 20kV and connected to the EirGrid National Grid at 110kV. 20kV switchgear used was ABB UniGear, protection relays used were ABB. Conlon Power Services responsible for commissioning of entire Independent Power Producer's side of substation.
DB03, DB04 and DB05 (Install & Commissioning): A multi-national companys' data storage facility in West Dublin, Ireland distributing to data halls at 10kV and connected to EirGrid at 110kV. 10kV switchgear used was ABB UniGear, protection relays used were ABB RE_ series. Conlon Power Services responsible for installation and commissioning of 10kV switchgear, 3 number 63MVA 110/10kV power transformers and all associated protection relays. Also tasked with commissioning of 10kV generator protection and G10 Utility / Generator Interface protection relays.

Betws Windfarm (Commissioning): A 50MVA windfarm collecting at 33kV and connected to the UK National Grid at 132kV. 33kV switchgear used was Siemens NXplus C, protection relays used were Siemens and Areva. Conlon Power Services responsible for commissioning of entire Independent Power Producer's side of substation, including programming and commissioning of G59 protection and G59 sequenced auto-restoration scheme.

Fullabrook Windfarm (Commissioning): A 70MVA windfarm collecting at 33kV with 33kV StatCom (Static Compensation for fast reaction to Grid Disturbances) and connected to the UK National Grid at 132kV. 33kV switchgear used was ABB ZX1 Gas Insulated Switchgear, protection relays used were ABB and Areva. Conlon Power Services responsible for commissioning of entire Independent Power Producer's side of substation, including programming and commissioning of G59 protection and G59 sequenced auto-restoration scheme.

Bancroft and Newbury 110kV Stations (Commissioning): Two turnkey utility 110kV stations feeding data centres commissioned on behalf of ABB. 110kV switchgear used was ABB ELK Gas Insulated Switchgear, protection relays used were ABB and Siemens. Conlon Power Services responsible for commissioning of entire utility side of substation. All commissioning was witnessed by the utility's consultant.
Longford, Ballinrobe and Oldcastle 38kV Stations: Three utility 38kV - 20/10kV distribution substations. 38kV switchgear used was Areva W1 Gas Insulated Switchgear and Siemens 3AP CB. 20/10kV switchgear used was Siemens NXplus C and Cooper LBFMs. Protection relays used were Siemens, ABB and Areva. Conlon Power Services responsible for entire commissioning of substation. Commissioning standards were audited throughout these projects and Conlon Power Services are accredited Level 1 and Level 2 commissioners by ESB Networks.